This is a replacement cartridge for any Nature2 System or Duo Clear Saltwater System, for pools of max 130,000L pool volume.
The Zodiac DuoClear 130 Replacement Cartridge has a lifespan of about 6 months. Do not use the cartridge after 6 months of continuous use. Not replacing your cartridge when required will lead to your pool not being adequately sanitized by chlorination alone. The Zodiac DuoClear 130 Replacement Cartridge requires an adequate amount of residual silver that is provided by the cartridge in order to effectively sanitize your pool.
Simply remove old cartridge filter and replace with new.
Our Showrooms will be closed December 20th, 2025 to February 17th, 2026.
Our online store and service department will remain open.
| Service | We are still open during the showroom shutdown.
|
| Online Store:
| Our online store are still open during the showroom shutdown.
|
Please, enter a valid value